Jiamusi
China
Jiamusi is projected to face significant climate hazards, particularly frequent heatwaves and heavy precipitation events. These risks are expected to intensify, leading to increased occurrences of heat-related health issues and elevated energy demand. Concurrently, heavy rains raise the likelihood of flooding, threatening infrastructure and harm to local communities. The combination of heightened temperatures and intense precipitation places Jiamusi in a vulnerable position, affecting both urban ecosystems and public services. As the city faces these challenges, it highlights the critical need for comprehensive assessments of climate vulnerabilities and impacts. Technology-enabled climate resilience solutions have not yet been documented for Jiamusi, further emphasizing the importance of enhancing adaptive capacity in response to its evolving climate hazards. Vigilant monitoring and research into these projected changes will be essential for safeguarding the city’s future.
Hazard Outlook
How will Jiamusi's projected climate hazards compare to other cities under a 3.0°C future warming scenario?
Heavy Rainfall Days
With 11 days of heavy rainfall expected, Jiamusi ranks higher than most cities for extreme precipitation events.
Elevation
At 84 m elevation, Jiamusi faces elevated risk from coastal flooding and sea level rise.
Maximum Temperature
Jiamusi's projected maximum temperature of 8.9°C is near the median of cities globally under a 3.0°C warming scenario.
Maximum Rainfall
Jiamusi's projected maximum rainfall of 10 mm is near the median of cities globally.
Longest Heatwave
Jiamusi may experience heatwaves lasting up to 4 days, lower than most other cities.
Exposure Summary
Adaptation Priorities
Jiamusi faces elevated exposure to heavy rain, elevation. These areas may warrant priority attention in adaptation planning.
Data source: Climate projections from the IPCC AR6 scenario analysis. See our methodology for details on how we process and interpret this data.
Deployed Solutions
Deployed climate adaptation technologies identified in Jiamusi.
No solutions have been documented for Jiamusi.
This is an archived snapshot of the database.
Recommended Solutions
Proven solutions from similar cities that could help diversify Jiamusi's resilience portfolio
GIS-Based Groundwater Protection Zoning and Database System
83%This approach establishes a comprehensive groundwater management system for Huangshi through Geographic Information Systems (GIS) technology to address severe contamination and inadequate surveying of the city's groundwater resources.
Automated Water and Rain Monitoring System with Provincial Integration
83%The Huangshi Municipal Housing and Urban-Rural Development Bureau is constructing an automatic measuring and reporting system of water and rain that connects with the provincial flood monitoring system to realize information sharing through a special communication module.
River Hydraulic Modeling and Water Quality Monitoring System
81%Belgrade faces a critical wastewater management challenge, as the city lacks basic wastewater treatment facilities and discharges sewerage and stormwater directly into the Sava and Danube rivers without any prior treatment.
Smart Water Metering for Real-Time Distribution Network Management
81%Smart metering technology in Belgrade's water distribution network collects and transmits real-time water usage data from residential and industrial end users to improve monitoring and management capabilities.
Floating Solar Photovoltaic Systems on Reservoirs
79%The Water Supplies Department (WSD) has pioneered floating photovoltaic (FPV) technology on Hong Kong's reservoirs, beginning with two 100 kW pilot systems installed at Shek Pik Reservoir and Plover Cove Reservoir in 2017.
Smart Water Metering and Automatic Meter Reading System
79%The Water Supplies Department is promoting wider use of smart water meters and Automatic Meter Reading (AMR) System, planned to work in conjunction with the Water Intelligent Network (WIN) to help identify problems.
Smart Water Meter System with AI-Powered Consumption Analytics
79%The Water Supplies Department is exploring the use of Automatic Meter Reading (AMR) coupled with mobile applications to enhance consumers' awareness of their water consumption on a timely basis, thereby facilitating behavioural changes to save water.