Resilience Scanner

Tuxtla Gutiérrez is projected to face increasing climate hazards in the future, particularly frequent heatwaves and a heightened risk of malaria. The intensification of heat events will likely lead to serious public health challenges, impacting vulnerable populations significantly. Additionally, the changing climate is expected to create conditions favorable for the spread of malaria, exposing more individuals to the risks associated with this disease. The dual threat of heatwaves and malaria presents a complex scenario for public health and urban management, especially in communities that may already be disadvantaged. It is important to note that we have not yet identified technology-enabled climate resilience solutions for this city, amplifying concerns about its capacity to adapt effectively to these emerging challenges. Hence, proactive measures are essential to address these vulnerabilities and safeguard the well-being of the city's residents against the impactful realities of climate change.

Hazard Outlook

How will Tuxtla Gutiérrez's projected climate hazards compare to other cities under a 3.0°C future warming scenario?

Longest Heatwave

55th percentile Elevated exposure

Tuxtla Gutiérrez may experience heatwaves lasting up to 5 days, higher than most other cities.

Tuxtla Gutiérrez
0.0 Shorter → Longer 92

Maximum Temperature

43rd percentile Moderate exposure

Tuxtla Gutiérrez's projected maximum temperature of 9.3°C is near the median of cities globally under a 3.0°C warming scenario.

Tuxtla Gutiérrez
5.0 Cooler → Hotter 13

Maximum Rainfall

26th percentile Moderate exposure

Tuxtla Gutiérrez's projected maximum rainfall of 8 mm is near the median of cities globally.

Tuxtla Gutiérrez
0.0 Lower → Higher 35

Heavy Rainfall Days

11th percentile Lower exposure

With 9 days of heavy rainfall expected, Tuxtla Gutiérrez ranks lower than most cities for extreme precipitation events.

Tuxtla Gutiérrez
0.0 Fewer → More 36

Elevation

82nd percentile Lower exposure

At 538 m elevation, Tuxtla Gutiérrez faces lower risk from coastal flooding and sea level rise.

Tuxtla Gutiérrez
-8.0 Lower → Higher 4k

Exposure Summary

Heatwave
Max Temp
Max Rain
Heavy Rain
Elevation

Adaptation Priorities

Tuxtla Gutiérrez faces elevated exposure to heatwave. These areas may warrant priority attention in adaptation planning.

Data source: Climate projections from the IPCC AR6 scenario analysis. See our methodology for details on how we process and interpret this data.

Deployed Solutions

Deployed climate adaptation technologies identified in Tuxtla Gutiérrez.

No solutions have been documented for Tuxtla Gutiérrez.

This is an archived snapshot of the database.

Recommended Solutions

Proven solutions from similar cities that could help diversify Tuxtla Gutiérrez's resilience portfolio

GIS-Based Groundwater Protection Zoning and Database System
78%
From: Huangshi

This approach establishes a comprehensive groundwater management system for Huangshi through Geographic Information Systems (GIS) technology to address severe contamination and inadequate surveying of the city's groundwater resources.

Automated Water and Rain Monitoring System with Provincial Integration
78%
From: Huangshi

The Huangshi Municipal Housing and Urban-Rural Development Bureau is constructing an automatic measuring and reporting system of water and rain that connects with the provincial flood monitoring system to realize information sharing through a special communication module.

River Hydraulic Modeling and Water Quality Monitoring System
77%
From: Belgrade

Belgrade faces a critical wastewater management challenge, as the city lacks basic wastewater treatment facilities and discharges sewerage and stormwater directly into the Sava and Danube rivers without any prior treatment.

Smart Water Metering for Real-Time Distribution Network Management
77%
From: Belgrade

Smart metering technology in Belgrade's water distribution network collects and transmits real-time water usage data from residential and industrial end users to improve monitoring and management capabilities.

Floating Solar Photovoltaic Systems on Reservoirs
74%
From: Hong Kong

The Water Supplies Department (WSD) has pioneered floating photovoltaic (FPV) technology on Hong Kong's reservoirs, beginning with two 100 kW pilot systems installed at Shek Pik Reservoir and Plover Cove Reservoir in 2017.

Smart Water Metering and Automatic Meter Reading System
74%
From: Hong Kong

The Water Supplies Department is promoting wider use of smart water meters and Automatic Meter Reading (AMR) System, planned to work in conjunction with the Water Intelligent Network (WIN) to help identify problems.

Smart Water Meter System with AI-Powered Consumption Analytics
74%
From: Hong Kong

The Water Supplies Department is exploring the use of Automatic Meter Reading (AMR) coupled with mobile applications to enhance consumers' awareness of their water consumption on a timely basis, thereby facilitating behavioural changes to save water.